CEGH REMIT platform for publication of inside information

This platform enables market participants to publish inside information according to REMIT Regulation (EU°No.°1227/2011).
The CEGH REMIT Platform is endorsed by E-Control Austria, inside information can be published in English (or in the official language(s) of the relevant Member State and in English) via the CEGH REMIT Platform in an effective manner.
The use of the CEGH REMIT Platform is free of charge. For detailed information please refer to the "Terms of Use"
Export posting
Export postings
Please choose which posting versions should be included in the download:
21.04.2022 07:41 CEST
00048437-21X000000001398N_001 (dismissed)
Nord Stream AG
21X000000001398N
Internal inspection of the pipeline
Unavailabilities of gas facilities
Offshore pipeline unavailability (planned)
Event period
03.06.2022 06:00 CEST - 17.06.2022 06:00 CEST
A scheduled regular internal inspection of the Nord Stream's offshore pipeline system in the period 03.06.2022-29.06.2022 with variable partial capacity restrictions
ACER-ID: 000000005545_000000048437_001
Asset
GREIFSWALD-NEL (exit) (21Z000000000255M)
Balancing zone(s)
Trading Hub Europe (37Y005053MH0000R)
Unavailable capacity
5,318,683
kWh/h
Available capacity
42,486,737
kWh/h
Technical capacity
47,805,420
kWh/h
ACER-ID: 000000005546_000000048437_001
Asset
GREIFSWALD-OPAL (exit) (21Z000000000241X)
Balancing zone(s)
Trading Hub Europe (37Y005053MH0000R)
Unavailable capacity
2,847,573
kWh/h
Available capacity
22,747,007
kWh/h
Technical capacity
25,594,580
kWh/h